OUR PROJECTS

British Petroleum – Georgia

ABOUT THIS PROJECT

British Excellence

With the expansion of facilities, BP’s refinery faces inherent voltage fluctuation from load changes.

 

Exceeding Expectations with Performance

Ashley-Edison has supplied Automatic Voltage Stabilisers, housed in Outdoor IP54 (BS / EN 60529) / NEMA 3 enclosures that withstand all weather conditions whilst ensuring facility is not affected by voltage fluctuations on load change. Voltages are maintained at optimum levels to safeguard sensitive equipments.

client

BP International Ltd

PROJECT COMPLETION

2013

EQUIPMENT SIZE

AVR | Up to 1000kva

Scroll to Top